This article provides a general overview of how to start the system for the first time after installation and how to perform normal day-to-day startup from the touchscreen interface.
Before initial startup
Before operating the generator for the first time, confirm that installation has been completed and that the site meets the published utility, environmental, and clearance requirements.
- Confirm incoming power matches the system requirements.
- Confirm compressed air supply is connected and meets specification.
- Confirm the nitrogen outlet connection is complete.
- Confirm the installation area is clean, dry, level, and ventilated.
- Confirm the E-Stop is released.
- Confirm the touchscreen powers on correctly.
Initial startup procedure
- Verify the system is fully installed and ready for operation.
- Ensure the E-Stop is not engaged.
- Confirm the PLC and touchscreen are active.
- From the Home screen, select the desired language.
- Press Continue to open the Status screen.
- Review the live operating values shown on the Status screen.
- Use the On/Off control on the Status screen to start the generator.
- Allow the system to cycle and build to normal operating conditions.
What to watch during startup
The Status screen displays the primary operating values used to confirm normal startup.
- Pressure
- Purity
- Flow rate
Purity discharge during startup
The system includes a purity discharge feature. The Purity Discharge Rate setting is the minimum purity that must be met before nitrogen is allowed to flow to the customer application. If tank gas does not meet that threshold, it will be discharged to atmosphere until acceptable purity is reached.
Standby operation
N2GEN-FLEX systems can automatically enter standby mode during periods of low nitrogen demand to reduce unnecessary air consumption.
During operation, if output pressure remains above the configured Stopping Pressure for longer than the High Pressure Shutdown Delay, the system will go into standby. It will resume operation when pressure falls back to the configured Starting Pressure.
Depending on configuration, standby can also be controlled by flow rate settings rather than pressure settings. These standby methods should not be changed without direction from South-Tek Systems.
Normal startup after shutdown
For routine startup after the system has already been commissioned:
- Confirm the E-Stop is released.
- Confirm the touchscreen is powered on and responsive.
- Open the Status screen.
- Verify there are no active conditions preventing startup.
- Use the On/Off control to start the system.
- Review pressure, purity, and flow rate during the startup cycle.
Shutdown delay reminder
If the system does not start
- Confirm the E-Stop is not engaged.
- Confirm the PLC is powered on.
- Confirm incoming power is within specification.
- Confirm the system is not still within the shutdown delay period.
- Review the touchscreen for alarms or abnormal readings.
Do not adjust during startup
Related articles
- N2GEN-FLEX Series Overview
- N2GEN-FLEX Series Site and Utility Requirements
- N2GEN-FLEX Series Installation Guidelines
- N2GEN-FLEX Series Controls and Touchscreen Navigation
- N2GEN-FLEX Series Alarms, Trends, and Common Troubleshooting
- N2GEN-FLEX Series Safety Guidelines
Documentation
For full operating, installation, and maintenance guidance, download the documents below.