If you have measured a void in your CMS and ordered additional material, use the following process to refill the sieve beds.
-
- Close the inlet valve that supplies feed air to the N2 generator
- Turn the generator off from the controller
- If your unit has valves on each sieve bed, open the valves on both sieve beds located behind the pressure gauge until pressure reaches 0 PSI, then valve closed. If the sieve bed has no valves, pull up on safety relief valve to release pressure.
- Remove the inspection ports on the top of sieve bed A slowly, allowing any remaining air pressure to drain.
- Using a funnel, fill the bed until the material reaches the top of the thread.
- Reinstall the plug
- Repeat steps 4 through 6 for bed B
- Turn the generator back on
- Open your feed air valve
- Allow the unit to run for ~1 hour
- Repeat steps 1 through 9 until no more material will fit into the sieve bed.