Confirm these site and utility requirements before the unit ships or the riser room is roughed in. All three models share the same floor-standing cabinet, but site preparation splits along one line: the FPS-1650 has an internal oil-free compressor and needs only power, the nitrogen line and drains, while the FPS-3250 and FPS-5000 are fed by an external air compressor that the site has to accommodate, power, and pipe. Getting these conditions right up front is what keeps the system reaching and holding its 98.5+% purity specification, and it prevents the startup problems that are expensive to fix after the walls close in. Installation, electrical connection and commissioning are for qualified, trained and authorized persons only — a licensed electrician for the power connection and a licensed sprinkler contractor for the fire protection piping.
Requirements at a glance
| Requirement | FPS-1650 | FPS-3250 & FPS-5000 |
|---|---|---|
| Environment | Indoor, nonhazardous, well-ventilated, dry; 40–100°F (4–38°C) | |
| Electrical | 120–240 VAC, 50/60 Hz, single phase; draws < 8 A | 120–240 VAC, 50/60 Hz, single phase; draws < 5 A. The external feed compressor needs its own service. A dryer fitted inside the cabinet runs off the generator's supply; a dryer standing separately in the room needs its own service, and its load is not in the draw figure above |
| Over-current protection | 15 A over-current protection built into the cabinet power entry module. It protects the generator only — it is not the branch-circuit protection and not a disconnecting means. Size and protect the branch circuit to the unit nameplate and local code | |
| Air supply | Internal oil-free compressor with its own intake pre-filter — no external feed air for nitrogen production. Where the automatic air bypass is fitted, it needs its own air source (see Bypass air, under Air supply) | External compressor required, cut-out set to 175 PSIG — South-Tek-supplied units come preset, and a compressor bought elsewhere has to be confirmed with South-Tek Service before it is selected. The cabinet inlet regulator is factory set at 120–125 PSIG and is not a field adjustment. Feed air 40–100°F, dew point below 40°F |
| Air drying | FPS-1650: not required | Feed air must arrive with a dew point below 40°F. Drying is normally refrigerated, either fitted inside the cabinet or standing separately in the room — the job's submittal shows which. |
| Cabinet connections | 1/2" NPT female unless otherwise stated | |
| Drains | Two drain connections low on the cabinet's left side, 1/4" OD for 1/4" OD tubing. Pipe each individually to a floor sink and leave open to atmosphere | Two drain connections low on the cabinet's left side, 1/4" NPT female bulkheads fitted with push-to-connect connectors for 1/4" OD tubing. Pipe each individually to a floor sink and leave open to atmosphere |
| Clearance | Left side is the electrical face: NEC 110.26 working space of 36" deep x 30" wide x 6.5 ft high, kept clear. 36" at the front for maintenance. 6" minimum on the remaining sides for ventilation. Top clear for gas-line connections | |
| Cabinet size | 26" W x 18" D x 59" H; 63.6" overall including the gas connections on top | |
| Floor | Hard, flat, level, rated for the installed weight with margin (unit ~223 lb) | Hard, flat, level; unit ~243 lb (FPS-3250) / ~303 lb (FPS-5000), plus the feed compressor and any receiver — rate the floor with margin above those weights |
| Noise | Generator < 90 dBA. On the FPS-3250 and FPS-5000 the feed compressor adds to that, so the room will be louder — plan hearing protection for anyone working in the room while the equipment runs | |
Installation environment
Install the generator indoors in a nonhazardous, climate-controlled location that is well ventilated and never sealed off from normal air changes. Hold the ambient temperature between 40°F and 100°F (4–38°C) with all of the equipment running at design ambient, and keep the area dry. A closed riser room holding the generator, the feed compressor and a dryer runs well above corridor temperature, so confirm the room has a ventilation or cooling path sized for the heat that equipment rejects — the 6" clearance around the cabinet is not one. Give the mechanical contractor the electrical input of everything going in the room, from the nameplates, and the 100°F ceiling. Where practical, put the generator and its supporting equipment in the same room — it shortens the air piping, reduces pressure drop, and keeps service and troubleshooting in one place.
Footprint, floor, and clearance
All three models use the same floor-standing cabinet: 26" wide, 18" deep, and 59" tall, and 63.6" overall once the gas connections on top are counted. The floor has to be hard, flat, level, and rated for the installed weight of the equipment with margin — approximately 223 lb (FPS-1650), 243 lb (FPS-3250) or 303 lb (FPS-5000), plus the feed compressor, receiver and dryer where the design includes them. The 300+ lb minimum published for the FPS-1650 covers that model only; on the FPS-3250 and FPS-5000 rate the floor to the actual load. On an elevated slab, a wood-framed floor or a mezzanine, have the structural engineer of record confirm the loading — the 26" x 18" footprint concentrates that weight over a small area. Four anchor bolt-holes are provided in the support legs; the hole size and pattern are on the general arrangement drawing — get it before the slab is poured or inserts are set. Anchor the cabinet wherever site, seismic or local code requires it — the cabinet is 59" tall and top-heavy. South-Tek imposes no anchoring requirement of its own, so the governing requirement is the code.
- Provide 36" of clearance at the front — routine maintenance and the filter change are done through the front door.
- The left side is the electrical face: the power entry module, the UL 508A control panel, the touchscreen and both filter drain connections are all on it. NEC Article 110.26 working space applies there, not at the front: 36" deep, 30" wide or the width of the equipment — whichever is greater — and 6.5 ft high, kept clear, illuminated and never used for storage. At 120–240 V single phase the voltage to ground is 150 V or less, so 36" is the requirement in every installation condition — it does not reduce, and the 30" width is wider than the cabinet's 18" side, so the space overhangs the front and rear corners. Provide 6" minimum on the remaining sides for ventilation, and route the drain tubing so it does not encroach on the working space.
- Leave the top of the cabinet clear for the gas-line connections and the storage-tank pressure gauge.
Delivery and access
The generator arrives bolted into a wooden crate. Walk the route from the dock to the riser room before the delivery date and confirm door widths, turns, thresholds and elevator capacity against the crate dimensions and gross shipping weight on the packing list, and against 63.6" overall for the uncrated cabinet with its top gas connections, at up to about 303 lb. The cabinet is tall and top-heavy: move it upright on a pallet jack or equipment dolly, use at least two people, strap it to the dolly on ramps and thresholds, and never lift or tilt it by the top fittings or the touchscreen.
If the unit lands on site before the room is ready, store it upright (or in its crate as shipped) in a dry, climate-controlled space held between 60°F and 80°F — a narrower window than the 40–100°F operating range. Never stack anything on top of it, and keep gas lines capped and dry so moisture does not enter the generator at hook-up. Unpacking, shipping-bolt removal, and mounting are covered in Installation and Startup.
Cabinet connections and layout
The FPS-1650, FPS-3250 and FPS-5000 all ship with 1/2" NPT female connections unless the order specified otherwise. Confirm each connection location against the general arrangement drawing in your installation package before opening a valve or energizing the unit. The drawing below is dimensioned on an FPS-3250. The cabinet envelope is common to all three models; confirm fitting types and drain locations for the model you actually have.
| # | Component | Service |
|---|---|---|
| 1 | 1/2" FNPT ball valve | Air inlet |
| 2 | 1/2" FNPT ball valve | N2 out |
| 3 | 0–160 PSIG pressure gauge | Internal storage tank pressure |
| 4 | 1/4" drain connection (two places) | Filter drain line connections |
| 5 | Electrical assembly | System controller (PLC) and touchscreen |
| 6 | Power entry module — read the over-current rating off the device | System main power connection |
| 7 | UL 508A open-type industrial control panel | Electrical connections |
| 8 | UL 508A open industrial control panel certification label | — |
| 9 | Electrical panel and terminal block torque specification label | Torque values for field terminations — torque every field connection to these values |
| 10 | Product serial number label | — |
| 11 | Buzzer and display screen warning information label | — |
| 12 | Nitrogen generator information label | — |
Electrical requirements
- Supply 120–240 VAC, 50/60 Hz, single phase. The FPS-1650 draws less than 8 A; the FPS-3250 and FPS-5000 draw less than 5 A. Those figures are the generator alone and do not include a dryer fitted inside the cabinet, so size the branch circuit to the unit nameplate and local code rather than to the draw figure. Check the product information label against the service before energizing, as you would on any equipment.
- Provide a lockable disconnecting means for the generator ahead of the cabinet, located and rated to NEC and local code. The power entry module on the cabinet is not a service disconnect and is not a lockout point. De-energize and lock out at that branch-circuit disconnect before opening the cabinet or the left-side electrical cover and before landing any conductor. On the FPS-3250 and FPS-5000, provide a separate lockable disconnect for the feed compressor, and for a dryer standing separately in the room.
- Land the incoming power at the cabinet's power entry module, on the left side of the cabinet — not directly onto the internal power supply. That module carries the generator's built-in 15 A over-current protection, which is supplementary protection for the machine: it is not the branch-circuit protection and not a disconnecting means. Size and protect the branch circuit to the unit nameplate and local code, and torque every field termination to the values on the torque label inside the cabinet.
- Units ship with a standard 3-prong US power cord unless the order specified otherwise, so either a hard-wired connection or a dedicated receptacle is acceptable and many fire-protection installs are hard-wired. A receptacle is not a substitute for the lockable disconnecting means, and some authorities will not accept cord-and-plug connection of fire protection equipment at all — check before specifying it.
- Run an equipment grounding conductor with the branch circuit and land it on the cabinet ground terminal. Do not rely on conduit alone for the ground path, and never use the drain piping or the sprinkler piping as a grounding path.
- The control panel is built to UL 508A as an open-type industrial control panel — that listing covers the control panel, not the generator as a whole. It is an open assembly protected only by the generator cabinet: once the left-side cover is off there is no dead front and no protection against incidental contact. Treat the cabinet interior as energized until it is locked out and verified dead, and let only qualified persons open it. Electrical schematics are available from South-Tek Service on request.
- Plan the signal wiring at rough-in. The generator provides dry contacts for the common alarm, the bypass alarm and — as an option — power loss, plus optional analog outputs to a building management system and a field-installed remote stop switch, all wired by others. If any of those are going to the fire alarm panel or a BMS, pull that cable at rough-in in its own raceway, separated from the power conductors. The controller also supports Ethernet for remote access and MODBUS TCP/IP, so pull a network drop to the cabinet at the same time if the customer wants remote monitoring. Get the wiring schematic from South-Tek Service before you pull any of it.
- FPS-3250 and FPS-5000 only: the external air compressor needs its own service, sized and protected to its nameplate. A dryer fitted inside the generator cabinet runs off the generator's own supply; a dryer standing separately in the room needs its own service, so settle which arrangement the job has before the electrical rough-in. If the compressor is three-phase, verify rotation before first start — running a compressor backwards will damage it and it is one of the most common startup call-backs.
Air supply
FPS-1650. No site air is required for nitrogen production. The FPS-1650 has an integrated oil-free compressor with its own intake pre-filter, so the only utilities to plan for are power, the nitrogen line, and drains.
FPS-3250 and FPS-5000. These models are fed by an external air compressor, normally a South-Tek-supplied unit matched to the system. Drying is normally refrigerated, and it is either fitted inside the generator cabinet or supplied as a separate dryer standing in the room — settle which before laying out the space and the electrical rough-in, because it changes both the floor plan and the branch circuits. The feed air has to meet all of the following at the generator inlet:
- Pressure: the feed compressor delivers line pressure to the cabinet and the generator's own inlet regulator drops it to the 120–125 PSIG the machine runs on. South-Tek-supplied compressors are preset to cut out at 175 PSIG, which keeps the regulator supplied with headroom above its setting under flow. If the compressor is not being bought from South-Tek, confirm the selection with South-Tek Service before it is ordered, and set it to the same 175 PSIG cut-out. Neither the compressor pressure switch nor the cabinet inlet regulator is a field adjustment — both are set at the factory and left alone.
- Temperature: 40–100°F (4–38°C).
- Dew point: below 40°F (4°C). This is what the refrigerated drying is there for — moisture carried into the PSA beds ruins the carbon molecular sieve, and that damage is not a warranty repair.
- Source: the feed air has to be clean, dry and dedicated. A lubricated compressor or a house-air tie-in needs coalescing filtration ahead of the generator, and house air that shuts down overnight or on a plant shutdown is not an acceptable supply for fire protection equipment.
- Flow: peak feed-air demand can reach up to three times the average feed-air flow rate — size the receiver and the piping for the peak, not the average. The compressor itself is selected with South-Tek.
The generator and the feed compressor are sized from two different numbers. The generator model is chosen from the largest single zone the system supervises, never from the sum of all zones, because NFPA 13 requires the air supply to restore normal system pressure within 30 minutes. The feed compressor on an FPS-3250 or FPS-5000 is sized from the generator's own feed-air demand at peak, not from horsepower. A compressor not supplied by South-Tek has to be confirmed with South-Tek Service before it is selected — against the actual zone gallonage, the supervisory pressure and the generator's feed-air demand. The generator carries a nominal 14.8-gallon internal nitrogen storage tank. An additional receiver belongs in the room only if the design needs storage beyond that.
Bypass air. The automatic air bypass is an ordered option fitted inside the cabinet. Where it is present it holds the system on compressed air during the fill test and while the generator is down, so it needs an air source. On the FPS-3250 and FPS-5000 it draws from the same compressed-air inlet as the generator, so the feed compressor has to cover that duty as well. On the FPS-1650, which takes no external air for nitrogen production, settle where the bypass air comes from at the order stage — it is not something to discover at commissioning. Whatever supplies the bypass has to hold the system above the bypass cut-off pressure on the controller's Bypass Settings screen, and deliver enough flow to restore normal system pressure on the largest zone within 30 minutes.
Drain connections
The particulate and coalescing filters drain automatically, and those drains have to go somewhere. The cabinet has two 1/4" drain connections low on the left side, each placarded Drain line — do not plug, at 18.5" and 20.5" above the base and projecting about an inch from the face. Plumb them individually to the nearest floor sink or site drain and leave them open to atmosphere. Do not tee them together, and do not cap them. Run each line with continuous fall — no traps, no loops, no rise at any point — and terminate above the rim of the floor sink with a visible air gap, never a direct connection. A line that runs flat or uphill will not drain, the bowl fills, and the filter starts passing water with nothing to show for it at the panel. Secure the tubing along its whole run into the sink — the auto-drains discharge a short burst of compressed air with the condensate, and unsecured tubing will whip.
Planning the riser room
The generator is one piece of a larger assembly. Plan space, power, and piping for everything that has to live in the room:
- Feed compressor (FPS-3250 / FPS-5000). Allow the clearance the compressor manufacturer specifies on all sides, and keep its tank drain accessible.
- Separate dryer or receiver, if the design includes one. A refrigerated dryer that is not integral to the generator, or a receiver beyond the generator's nominal 14.8-gallon onboard tank, needs its own floor space, power, and drain. Confirm from the submittal whether either is part of your package.
- Retrofits — the existing air supply. On an existing riser, disconnect and lock out, or remove, the air compressor and any air maintenance device feeding the system from it before the generator is cut in. Left energized it keeps pushing air into the system and the nitrogen purity never rises, while the gauge at the riser looks completely normal. Record the change so nobody re-energizes it at the next service visit.
- Bypass piping. Install it on every job — it is what lets the system stay supervised while the generator is serviced. Without it, every filter change and every service visit takes the riser out of supervision.
- Air Maintenance Device (AMD), one per riser — AMD-1 or equivalent, supplied by others. The AMD is a regulating device and contains no pressure switch; the riser's low-pressure supervisory switch is a separate device, still required, and wired to the fire alarm panel by others. The AMD has to close fully on a trip so the trip valve sees full differential.
- AutoPurge System (APS), one per riser. Mount horizontally at a remote, accessible point where water will not collect. It vents supervisory gas to atmosphere on every purge, so confirm the discharge point is in a ventilated space.
- Purity sample lines. Run a sample line from each zone back to the Quick Check™ PowerSaver Manifold, and take each sample from the hydraulically most remote point of that zone — at or near the inspector's test connection, off the top of the pipe. A sample taken at the riser reads the generator, not the system, and will show high purity on a system that is still full of air.
- Floor sink or site drain within reach of the generator, compressor, and dryer drain lines.
Additional piping and hosing
Any piping or hosing supplied by others must meet the unit's flow, pressure, and temperature requirements. If the run from the air receiver to the generator exceeds 50 feet, have a piping contractor size the line from the generator's feed-air demand — an undersized long run shows up later as low feed pressure and a generator that never reaches standby. Rate the feed piping and every fitting in it for the compressor's 175 PSIG cut-out, not for the 120–125 PSIG the generator runs on. Never reduce below the 1/2" cabinet inlet at any point in the run, and never fit a valve anywhere that could isolate a safety relief valve. Route piping so service access stays clear and pressure drop stays low, and use PTFE tape or an equivalent sealant on tapered pipe threads only, started a thread back from the end so no tape enters the gas stream — never on push-to-connect, compression or flare fittings.
What the installing contractor provides
- A hard, flat, level pad or floor area rated for the equipment weight.
- 120–240 V single-phase service to the generator, hard-wired or to a dedicated receptacle, sized and protected to the unit nameplate and local code, with an equipment grounding conductor landed on the cabinet ground terminal and a lockable disconnecting means ahead of the cabinet. On the FPS-3250 and FPS-5000, separate service and disconnect for the feed compressor, and for the dryer if it stands separately in the room.
- Compressed-air piping between the feed compressor and the generator, sized for the run (FPS-3250 and FPS-5000).
- Bypass piping around the generator.
- One AMD per riser.
- Sample lines from each zone to the Quick Check™ PowerSaver Manifold.
- Drain lines from the generator and from any compressor or dryer to a floor sink.
- Room ventilation. The generator's exhaust discharges from the cabinet into the room — there is no exhaust duct connection on any of these three models, so normal building air changes are the control, and any louvre, transfer grille or fan the room needs to achieve them is contractor scope.
- Signal cable and raceway from the generator's dry contacts to the fire alarm panel or building management system where the design calls for it.
Codes the AHJ will ask about
Cite these by subject and take the paragraph numbers from the edition adopted by your local authority having jurisdiction before putting them in writing — NFPA 13 was reorganized at the 2019 edition and the numbering shifts between editions.
- NFPA 13, 7.2.6 — the air supply must restore normal system pressure within 30 minutes. This drives feed-compressor sizing.
- NFPA 13, 7.2.6.2.1 — where an air maintenance device is required, and how it must be arranged.
- NFPA 13 — drainage provisions for dry and preaction systems (the paragraph number moved at the 2019 reorganization).
- NFPA 13, Annex E — nitrogen is an accepted corrosion-mitigation supervisory gas.
- NFPA 70 (NEC), Article 110.26 — working space at the generator's electrical panel, which is on the cabinet's left side. Article 430 covers the feed compressor's motor circuit; Article 440 covers a refrigerated dryer's hermetic motor-compressor.
- NFPA 25, Chapter 15 — impairment procedures: notification, tagging, interim measures and restoration. This governs every visit that interrupts supervision of the riser.
- NFPA 55 — applies where bottled nitrogen backup is kept on site (storage limits, ventilation, signage). Applicability turns on the maximum allowable quantity for the control area rather than on where the gas comes from; confirm with the AHJ.
- FM Global Data Sheet 2-0 — sprinkler installation guidelines; Data Sheet 2-1 — corrosion in automatic sprinkler systems, which is the one that addresses nitrogen supervision. If the job is FM-insured, obtain South-Tek's written confirmation of FM Approval status for the specific model and configuration being ordered, including the standard it is listed under, before it is specified.
Before installation — site checklist
- Verify the exact model, and confirm whether it is an FPS-1650 (internal compressor) or an FPS-3250 / FPS-5000 (external air required). Check that every zone's design supervisory pressure sits below the generator's storage pressure before the unit is ordered.
- Confirm the room holds 40–100°F with everything running, has normal building air changes, is not a sealed or confined space, and has a route for the generator's exhaust gas.
- Confirm the floor supports the installed equipment weight with margin and that the 26" x 18" footprint fits with 36" at the front, the NEC working space at the left side, and at least 6" on the remaining sides.
- Walk the delivery route against the crate dimensions and against 63.6" overall for the uncrated cabinet, up to ~303 lb — door widths, turns, thresholds, elevator capacity — and confirm 60–80°F storage if the unit arrives before the room is ready.
- Confirm the 120–240 V single-phase service lands at the power entry module, and that the lockable disconnect, the equipment grounding conductor and any signal or network cable to the fire alarm panel or BMS are all in the rough-in scope.
- Confirm the feed compressor and dryer are sized, ordered and scheduled (FPS-3250 and FPS-5000), that a compressor not supplied by South-Tek has been confirmed with South-Tek Service, that the compressor cut-out is set to 175 PSIG, that the dryer's location — in the cabinet or in the room — is settled, and that a dew point below 40°F can be met at the generator inlet.
- Confirm the floor sink or site drain location, and plan both drain runs.
- Confirm bypass piping, AMD and APS locations are on the drawings, and that the automatic air bypass, where it is fitted, has an air source.
- Verify the system holds pressure to the leakage rate the adopted code allows before the generator is ordered — a system that will not hold air will not hold nitrogen, and the generator will run continuously trying.
- On an existing, in-service riser, confirm the impairment plan before work starts — owner and monitoring company notified, system tagged, interim measures in place, and a restore-and-verify step scheduled before the crew leaves.
- Review the general arrangement drawing in the installation package against the actual room before rough-in.
Related articles
- N2-BLAST Fire Protection Systems Overview
- FPS-1650, FPS-3250, and FPS-5000 Overview
- FPS-1650, FPS-3250, and FPS-5000 Installation and Startup
- FPS-1650, FPS-3250, and FPS-5000 Operation and Alarms
- FPS-1650, FPS-3250, and FPS-5000 Preventive Maintenance
- N2-BLAST® FPS-1650, FPS-3250 & FPS-5000 — Safety Guidelines